Temporary road closure – Two Bridges, Fivehead

Works are expected to commence on 21st June 2021 and last for 12 days to enable Wessex Water to carry out works to install meter, hydrants and valves onto water main.

Please follow the link to view the above road closure; https://one.network/?tm=121607580 and the link for the Notice 2:    https://api-gb.one.network/downloads/tm/1111/3-notice-2_121607580_3317267_09876c1ea8.pdf

For any further information about this closure, please contact Wessex Water on 0345 600 4600 quoting reference: ttro440618