Parish Council Meeting Agenda – 7 Apr 25
Click here for the Agenda
in the heart of Somerset
Click here for the Agenda
Background There are major ongoing schemes in the Bridgwater area that require significant roadworks: The multi-billion-pound Agratas battery facility on the Gravity Campus in Puriton, and other work associated with the Gravity site Somerset Council’s own Dunball roundabout upgrade The Celebration Mile works as part of the Bridgwater Town Deal regeneration project These are essential … Read more
Temporary Road Closure: ttro591912S – OR – Cathanger Lane, Fivehead Please follow the link to view the above road closure; https://one.network/?tm=139994184 and the link for the Notice 2:https://api-gb.one.network/downloads/tm/1111/03-notice-2_139994184_3807484_6ac8358953.pdf The order becomes effective on 14th November 2024 and will remain in force for eighteen months. The works are expected to commence on 20th November 2024 and last for 6 hours (09:30 – 15:30) to enable Openreach to carry out … Read more
A wide load is planned to pass through Fivehead village during the morning of Wednesday 23 October. The exact timing is not confirmed, but likely to be around 9-10am. It will be exceptionally wide and low, similar to the one in August, where there were difficulties with parked cars particularly by the village green and … Read more
Please be aware that we have received a notification of a TTRN (urgent) road closure at Swell Lane, Fivehead which will commence on 15th October 2024 – 18th October 2024 (00:00 – 23:59) for a total of 4 days. This will enable Wessex Water to carry out works to repair service. The contractor has indicated that access for Emergency Services through the site is not permitted on this occasion. For any … Read more
A further wide load is planned to pass through Fivehead village during the afternoon of Monday 14 October. Exact timing is not available, but if the delivery should have to be re-arranged, a further update may follow on Monday morning. As before, the pinch points will be along the village green, around the corner at … Read more
Update – 24 October 2024 – Works below postponed due to localised flooding – likely to be re-planned 2025 *************** Please be aware that we have received notification of a date change to a temporary road closure at Bow Street, Langport, for approximately 80 metres. The new date for the works to commence is 26th October 2024 … Read more
We have been given advance notice of a wide and high delivery vehicle passing through Fivehead village during the afternoon of Wednesday 9 October. Exact timing of this movement is not available, but if the delivery should have to be re-arranged, a further update may follow. The pinch points for this load will be when it … Read more
Please follow the link to view the above road closure; https://one.network/?tm=138818977 and the link for the Notice 2:https://api-gb.one.network/downloads/tm/1111/03-notice-2_138818977_3756833_82f5a02a1f.pdf The order becomes effective on 29th August 2024 and will remain in force for eighteen months. The works are expected to commence on 4th September 2024 and last for 3 days (09:30 – 15:30) to enable National Grid to change a … Read more
Maintenance is planned on the A303 Ilminster Bypass. This includes repairs and surveys of the road surface, vegetation clearance, and barrier repairs. The A303 Ilminster Bypass will be fully closed from Monday 29 July to Thursday 1 August, 8pm to 6am each night. A diversion will be in place for eastbound traffic via the A358, A378 … Read more